UP-2210R/P Hardware installation and configuration manual
English version 20.0

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Unipower UP-2210 and is the answer not in the manual?

Unipower UP-2210 Specifications

General IconGeneral
BrandUnipower
ModelUP-2210
CategoryMeasuring Instruments
LanguageEnglish

Summary

Introduction

PQ Secure SQL User and Software Installation Manual

Details installation and configuration for PQ Secure system software.

PQ Secure Light User and Software Installation Manual

Covers installation and use of PQ Secure Light software.

Hardware Installation and Configuration Manual

Explains the hardware installation and configuration of the UP-2210R/P meter.

Technical Manuals

Provides technical data for the meters.

Safety Information

Installation Conditions

Specifies environmental requirements for safe and proper installation.

Installing the Instrument

Outlines procedures to ensure correct installation and minimize risks.

Power Supply

Details requirements for clean, regulated, and protected power sources.

Used Products

Information on proper disposal of the product and its components.

Undertaking and Warranty

Liability

Outlines Unipower's responsibilities and limitations regarding product use and specifications.

Warranties

Details the warranty period, terms, and conditions for product repair or replacement.

Patent

Lists patents and patent applications covering Unipower AB's products.

Components of the PQ Secure System

Measuring Device

Describes the UP-2210 as an advanced 3-phase power quality and disturbance analyser.

Communication

Explains various communication options for data transfer from meters to the server.

Portable Meter Unilyzer 900; Unilyzer 900 c

Introduces portable analysers that can integrate into the PQ Secure system.

Software

Lists and describes the main software programs comprising the PQ Secure system.

Server Performance

Provides guidance on estimating server hardware requirements based on data growth.

Installing Permanent Meter UP-2210 R;P

Location and Fitting

Details mounting options for UP-2210R (rack) and UP-2210P (panel).

Installation Diagram

Presents dimensional drawings and mounting considerations for the UP-2210R.

Connection Points

Identifies and describes various connection terminals on the UP-2210R/P.

Connection Alternatives

Covers multiple configurations for instrument transformers (PT/CT) for measurement.

3 Phase 4 Wire Measurement with Direct Voltage and 3 CTs

Wiring diagram for 3-phase measurement in low voltage networks with direct voltage and 3 CTs.

3 Phase 4 Wire Measurement with Direct Voltage and 2 CTs

Wiring diagram for 3-phase measurement with direct voltage and 2 CTs.

3 Phase 4 Wire Measurement with 3 CTs and 3 PTs

Wiring diagram for 3-phase measurement in distribution networks with 3 CTs and 3 PTs.

HV 3-Phase Measurement with 2 CTs and 2 PTs (Line-to-Line Voltages)

Wiring for HV 3-phase measurement using 2 CTs and 2 PTs for line-to-line voltages.

3-Phase Measurement with Direct Voltage, 2 CTs (Line-to-Neutral)

Wiring for 3-phase measurement in low voltage networks with direct voltage and 2 CTs.

HV;MV Earth Fault Monitoring via Channel U4

Procedure for monitoring ground point voltage for earth fault detection.

Vector Graph for Correct Connection

Tool in PQ Online to verify correct phase and ammeter connections.

Recommended Practices

Guidance for connecting UP-2210 for common network situations.

Digital Inputs and Outputs

Explains the use and configuration of digital inputs and relay outputs.

Substation Display

PQ Online Substation Display Configuration

Steps to configure the substation display unit for real-time monitoring and configuration.

Display

Installing Communication Equipment

Ethernet

Details Ethernet connection requirements, IP addressing, and firewall configuration.

Wireless GSM;3 G Router

Explains using wireless routers for remote meter access via GSM/3G networks.

RS-485

Describes RS-485 serial communication for connecting multiple meters over longer distances.

Using Multiple Meters with Westermo GDW-11 GSM;GPRS-Modem and RS-485

Demonstrates connecting multiple meters using an industry-grade GSM/GPRS modem.

DIP-Switch Settings

GPS Clock Synchronisation Module

Installation

Covers connecting the GPS adapter via Display Port or RS232 port.

GPS Communication Configuration

Details how to configure GPS synchronization using PQ Online.

IRIG-B

Explains time synchronization using IRIG-B connections.

Useful Information Regarding GPS

Notes on GPS mode operation and time setting priorities.

GPS Connection Instruction for UP2210;UP2210 R

Step-by-step guide for connecting a Garmin GPS16x-LVS antenna.

Attaching Several UP2210;UP2210 R to the Same GPS

Instructions for connecting multiple meters to a single GPS unit in parallel.

Installing Software

Installation Procedure

General guidance on installing PQ Secure system programs.

Installation Program

How to use the CD autostart menu to select and install software.

Installing PQ Online

Steps for installing the PQ Online software on computers.

Installing UniLauncher

Guide for installing the UniLauncher utility for USB meter connections.

PQ Online

Connect

Procedures for connecting to a meter via Serial (USB), Ethernet, or SmartCom Server.

Measurement Settings

How to configure meter settings, including wiring, transformers, and trig levels.

Wire-Connection Configuration. Settings Wizard

Wizard-driven setup for meter configuration, including transformer types.

Advanced Settings

Detailed configuration options for general settings, measure site properties, storage, and disturbances.

Real-time

Functionality for viewing real-time power quality parameters and trend graphs.

Communication Settings

Configuration of network parameters like IP address, subnet mask, and gateway.

Ethernet

Specific settings for Ethernet LAN connection.

DHCP and SmartCom

Configuring DHCP and Unipower SmartCom for automatic IP addressing.

IEC 61850

Optional support for IEC 61850 protocol.

Download Data

How to select and download measurement data files.

Tools

Access to status, manual trig, license, and firmware update functions.

Language

Option to change the display language of the PQ Online application.

USB Port

Information on using the USB port for meter connection via UniLauncher.

Appendix - Commissioning Checklists

Meter Installation Checklist

A checklist to verify proper installation and configuration of the meter on site.