Details installation and configuration for PQ Secure system software.
Covers installation and use of PQ Secure Light software.
Explains the hardware installation and configuration of the UP-2210R/P meter.
Provides technical data for the meters.
Specifies environmental requirements for safe and proper installation.
Outlines procedures to ensure correct installation and minimize risks.
Details requirements for clean, regulated, and protected power sources.
Information on proper disposal of the product and its components.
Outlines Unipower's responsibilities and limitations regarding product use and specifications.
Details the warranty period, terms, and conditions for product repair or replacement.
Lists patents and patent applications covering Unipower AB's products.
Describes the UP-2210 as an advanced 3-phase power quality and disturbance analyser.
Explains various communication options for data transfer from meters to the server.
Introduces portable analysers that can integrate into the PQ Secure system.
Lists and describes the main software programs comprising the PQ Secure system.
Provides guidance on estimating server hardware requirements based on data growth.
Details mounting options for UP-2210R (rack) and UP-2210P (panel).
Presents dimensional drawings and mounting considerations for the UP-2210R.
Identifies and describes various connection terminals on the UP-2210R/P.
Covers multiple configurations for instrument transformers (PT/CT) for measurement.
Wiring diagram for 3-phase measurement in low voltage networks with direct voltage and 3 CTs.
Wiring diagram for 3-phase measurement with direct voltage and 2 CTs.
Wiring diagram for 3-phase measurement in distribution networks with 3 CTs and 3 PTs.
Wiring for HV 3-phase measurement using 2 CTs and 2 PTs for line-to-line voltages.
Wiring for 3-phase measurement in low voltage networks with direct voltage and 2 CTs.
Procedure for monitoring ground point voltage for earth fault detection.
Tool in PQ Online to verify correct phase and ammeter connections.
Guidance for connecting UP-2210 for common network situations.
Explains the use and configuration of digital inputs and relay outputs.
Steps to configure the substation display unit for real-time monitoring and configuration.
Details Ethernet connection requirements, IP addressing, and firewall configuration.
Explains using wireless routers for remote meter access via GSM/3G networks.
Describes RS-485 serial communication for connecting multiple meters over longer distances.
Demonstrates connecting multiple meters using an industry-grade GSM/GPRS modem.
Covers connecting the GPS adapter via Display Port or RS232 port.
Details how to configure GPS synchronization using PQ Online.
Explains time synchronization using IRIG-B connections.
Notes on GPS mode operation and time setting priorities.
Step-by-step guide for connecting a Garmin GPS16x-LVS antenna.
Instructions for connecting multiple meters to a single GPS unit in parallel.
General guidance on installing PQ Secure system programs.
How to use the CD autostart menu to select and install software.
Steps for installing the PQ Online software on computers.
Guide for installing the UniLauncher utility for USB meter connections.
Procedures for connecting to a meter via Serial (USB), Ethernet, or SmartCom Server.
How to configure meter settings, including wiring, transformers, and trig levels.
Wizard-driven setup for meter configuration, including transformer types.
Detailed configuration options for general settings, measure site properties, storage, and disturbances.
Functionality for viewing real-time power quality parameters and trend graphs.
Configuration of network parameters like IP address, subnet mask, and gateway.
Specific settings for Ethernet LAN connection.
Configuring DHCP and Unipower SmartCom for automatic IP addressing.
Optional support for IEC 61850 protocol.
How to select and download measurement data files.
Access to status, manual trig, license, and firmware update functions.
Option to change the display language of the PQ Online application.
Information on using the USB port for meter connection via UniLauncher.
A checklist to verify proper installation and configuration of the meter on site.