Symmetry Bath Panel with End Storage Unit
SYMMETRY BATHS
Please note - remove all protective film from panels before fixing them together.
Ensure the under side of this bath rim is fitted at a height which will give the required
clearance for the panels and/or a bath end storage unit when fitting. Check that the floor is
level so it doesn’t impede the bath end storage unit door.
BATH SIDE PANELS WITH A TOP RAIL.
The top rail should be fitted first around the under side of the bath rim with the desired
amount of rail showing and fixed to the timber under the bath rim.
FITTING BATH SIDE PANEL WITH END STORAGE UNIT
Fix the 3 bath side panels together with the blocks and screws provided ensuring there is
a 2mm space between each panel (see g 1 A), and the 5mm feet are to the floor, add
two self adhesive stops to the top of each panel these afford enough clearance to allow
the storage unit door to open freely. The storage unit will be fitted with a 10mm high foot
which allows the unit door to clear the floor when opened.
Fit the adjustable foot at the base of the centre panel (see g 1 B), to support the panels.
Fit the keku clips as shown (see g 1 C), ensuring that they line up correctly on the top rail
and panels. Fix an L bracket to the underside of the top rail (see g 1 D), which will act as
a stop. Fit another L bracket to the wall approximately 100mm from the floor level where
the back of the side panel final position will be (see g 1 E).
Slide the End Storage unit into position. Do not fix it at this stage.
Slide the assembled panels onto the keku clips until they positively engage.
Adjust the End Storage unit until the door is in the desired position.
The End Storage unit can then be screwed to the top rail from the inside of the unit and
fixed to the back wall.
Keku clip
Transit support. This should be
removed prior to installation by
cutting at the pre-marked “V” cuts
Keku clip
Bracket fixed to
top rail only
Top Rail