EasyManua.ls Logo

UWE CCS-600 - Page 29

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
4. Crane scales parts should only be replaced
by trained professionals authorized by UWE.
5. It is strictly prohibited to disassembling
and repairing of the crane scale by any
personnel other than trained professionals
authorized by UWE.
Procedure:
1. Crane scale should be inspected and
maintained every 3 months by trained users.
Each inspection and maintenance must be
documented.
2. Crane scale must be sent every year to trained
professionals (UWE authorized personnel)
for full inspection and maintenance,
including safety and accuracy tests
(sending the crane scale to accredited lab
(CNLA) for accuracy testing if necessary).

Related product manuals