EasyManua.ls Logo

Vaillant VUW 286/5-3 (H-GB) User Manual

Vaillant VUW 286/5-3 (H-GB)
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and maintenance instructions
ecoTEC pro
VUW ..6/5-3
GB, IE
Publisher/manufacturer
Vaillant GmbH
Berghauser Str. 40 D-42859 Remscheid
Tel. +492191180 Fax +492191182810
info@vaillant.de www.vaillant.de

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Vaillant VUW 286/5-3 (H-GB) and is the answer not in the manual?

Vaillant VUW 286/5-3 (H-GB) Specifications

General IconGeneral
ModelVUW 286/5-3 (H-GB)
CategoryBoiler
TypeCombination Boiler
Fuel TypeNatural Gas
Efficiency RatingA
Dimensions720 x 440 x 338 mm
MountingWall-mounted
Warranty2 years
Domestic Hot Water Output28 kW
ErP efficiencyA
Hot Water Output11.4 l/min

Summary

1 Safety

1.1 Action-related warnings

Classification and signal words for action-related warnings.

1.3.10 Risk of death from electric shock

Precautions before working on product for electric shock risk.

1.2 Intended use

Description of the product's intended purpose and limitations.

1.3.4 Risk of death due to blocked or leaking flue gas routes

Poisoning risk from flue gas escape due to installation errors.

1.3 General safety information

Key safety guidelines for installers and users.

1.3.12 Risk of death from escaping flue gas

Ensuring condensate trap is full to prevent flue gas escape.

4 Set-up

5 Installation

5.1 Installation requirements

General requirements for product installation.

5.2 Installing the gas connection

Steps for connecting the gas supply.

5.9.3 Establishing the power supply

Procedures for connecting the power supply.

5.3 Checking the gas line for leak-tightness

Procedure for checking the gas line for leaks.

5.9 Electrical installation

General safety and procedures for electrical installation.

6 Operation

7 Start-up

7.1 Carrying out the initial start-up

Requirements for initial product start-up.

7.11.4 Checking the gas flow pressure

Procedure for checking gas flow pressure.

7.12 Checking leak-tightness

Checking for leaks in gas, heating, and DHW circuits.

7.11 Gas inspection

Checks related to gas supply and combustion.

7.11.5 Checking the CO2 content and, if necessary, adjusting it (air index setting)

Checking and adjusting CO2 content for optimal combustion.

8 Adapting the unit to the heating installation

8.6 Handing the product over to the operator

9 Troubleshooting

9.2 Eliminating faults

Procedure for eliminating detected faults.

9.6.3 Replacing the heat exchanger

Procedure for replacing the heat exchanger.

9.6 Replacing defective components

Procedures for replacing faulty parts.

10 Inspection and maintenance

11 Decommissioning

Appendix

C Overview of fault codes

List and explanation of product fault codes.

F Inspection and maintenance work

Required inspection and maintenance tasks and intervals.

G Commissioning Checklist

Benchmark Commissioning and Servicing Section requirements.

Related product manuals