7.4. CHARGE SYSTEM
This test determines charging system by testing its condition under loaded and unloaded
status.
7.4.1 Before Test
The engine and all the other accesso load must be OFF rst
7.4.2 Steps
7.4.2.1 Connect the Red (+) positive batte clamp to the (+) positive batte terminal. And
connect the Black (-) negative batte clamp to the (-) negative batte terminal. Ensure
that the clamp is securely attached to the correct terminals.
7.4.2.2 Ensure that the tester is in the MAIN MENU page below rst, press “BACK” key till you
nd page below or just press resta key rst till you nd the MAIN MENU page
below and t it.
BT310 12V & 24V Batte Analyzer
10
Cranking Test Result Reference Table
Cranking Voltage Cranking Ability Action to Batte
Reference Table (For 12V System)
>10.7V Good No Action
10.2V~10.7V Normal Keep Caution
9.6V~10.2V Bad Replace It Soon
<9.6V Ve Bad Relpace It Immediately