EasyManua.ls Logo

VELTIUM LITE Zero - Page 11

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
INSTALLATION
MANUAL
INSTALLATION
7
PREPARE THE CHARGER INSTALLATION
1. Mark the holes to be made.
2. Drill the holes.
3. Fit the wall plugs.
Insert the screw of the upper part and tighten it into the bushing as far as it will go.
In the case of the STAND, use the screws supplied with it in the packaging.
8
FIT THE UPPER SCREW
8 mm
1
2
3
Wall mounting: 4.8x38 screw
STAND assembly: M5x12 screw

Other manuals for VELTIUM LITE Zero