5.2 HOW TO HANG THE UNIT
Use the 4 chains and springs in the hardware pack provided with the unit. According to your needs, you can install the unit either in
vertical or horizontal position.
VERTICAL POSITION - ALL MODELS
HORIZONTAL POSITION (LEFT SIDE)
ALL MODELS EXCEPT HR 2.5 AND HRV 2500
H
ORIZONTAL POSITION (RIGHT SIDE)
HEPA 4000
ONLY
VD0075
VD0076
5. INSTALL THE UNIT
5.1 MOUNT THE PORTS ON THE UNIT
Mount the 8” oval ports and the 5” to 6” oval ports on the top of the unit using the screws provided in
the hardware box (4 screws #8 x 3/4” long per port). See figure beside.
NOTE: All ports of the HRV 2500 and HR 2.5 are 5” to 6” oval.
VO0018
• Insert the 4 hooks in the square holes and fix them to the unit using 4 screws #8 - 32 x 3/4”.
• Reinstall the front plate and the door and its stopper; close the door.
• Hang the unit to the floor joist, using 4 #8 x 1 1/2” screws, 4 chains and 4 springs.
See illustration beside.
VD0077
VO0020
- 11 -
CAUTION
The HRV 2500 and the HR 2.5 units must be level.