EasyManua.ls Logo

Venta AW902 - Product Overview and Operation Setup; Appliance Overview; Putting Into Operation Guide

Venta AW902
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 EN
PUTTING INTO OPERATION
!
Attention! Ensure that the device is switched off during all actions and the
switching power supply is disconnected from the outlet!
1 Unpack the appliance, set it up and use the transport castors 7 to move it to the
place you want. To do this, lift slightly on the right-hand side. Remove battery
protection and protective foil from remote control 11.
2 Open evaporator compartment 3 and remove water tank 4.
3 Open water tank 4 and fill up to the MAX marker with cold water.
4 Close the water tank 4 securely.
5 Insert the water tank 4 into the water basin 6 and close the evaporator compart-
ment 3.
6 Adjust display 1 to the position you want (3 positions possible).
7 Adjust cable connector to the length you want by winding/unwinding in cable com-
partment 11. Note: Make sure the cable connector is firmly fitted into the appli-
ance!
Connect power plug to mains and switch appliance on using on/off switch 2 or
remote control 13.
i
It can take approx. 60 seconds for the appliance to start up and the red light
on the display to go out. You will be able to hear a noise (gurgling), which is not a
quality defect.
1 Display
2 On/off switch
3 Evaporator compartment
4 Water tank
5 VentWave DISC stack
6 Water tray
7 Transport castors
8 UVC lamp (pre-installed)
9 Cable compartment
10 Hygiene DISC (pre-installed)
11 Remote control
OVERVIEW
1
2
3
4
5
9
6
7 10
11
8
AW902

Related product manuals