EasyManua.ls Logo

Vermont Castings 2550 Service Manual

Vermont Castings 2550
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
For the
VERMONT CASTINGS
1995 Encore
Model 2550
TABLE OF CONTENTS
History of Changes
Exploded View and Parts List
Service Procedures
Assembly and Disassembly
Gasketing
Appendix
Question and Answer IconNeed help?

Do you have a question about the Vermont Castings 2550 and is the answer not in the manual?

Vermont Castings 2550 Specifications

General IconGeneral
BrandVermont Castings
Model2550
CategoryStove
LanguageEnglish

Summary

History of Changes

Exploded View and Parts List

Exploded View and Component Identification

Diagram showing component layout and identification numbers for the Encore stove.

Stove Parts List

Lists part numbers for main stove components and shell enamel options.

Hardware Parts List

Detailed list of hardware components with their corresponding part numbers.

Service Procedures

Replacing the Refractory Package

Step-by-step instructions for removing and installing the stove's refractory components.

Replacing the Primary Air Cable

Guide on how to replace the primary air control cable for proper operation.

Adjusting Damper and Front Doors

Procedures for adjusting the stove's damper and front door positions for optimal sealing.

Disassembly and Assembly

Stove Disassembly Steps

Detailed instructions for taking apart the various components of the stove.

Gasketing Procedures

Instructions for applying gaskets to stove parts to ensure proper sealing.

Cementing Instructions

Guidance on using stove cement for joining parts and ensuring a tight seal.

Stove Reassembly Steps

Step-by-step guide for putting the stove components back together.

Gasketing

Gasketing Process Overview

General instructions for preparing parts and applying new gaskets.

Gasket Application Diagrams

Illustrations showing specific gasket sizes and locations for various stove parts.

Gasketing the Damper and Upper Fireback

Specific steps for gasketing the damper and upper fireback assembly.

Yearly Maintenance Suggestions

General Maintenance Checklist

Routine checks and tasks for maintaining the stove's overall condition.

Catalytic Combustor Inspection and Cleaning

Procedures for inspecting and cleaning the catalytic combustor for optimal efficiency.

Secondary Air Passage Cleaning

Instructions for cleaning the secondary air passageway to prevent blockages.

Checking Gasket Seals

Methods for testing and adjusting gasket seals on doors and the damper.

Cleaning the Stove Glass

Techniques for cleaning the stove glass to maintain visibility and prevent etching.

Related product manuals