REV : 0
REV DATE : 2/19
DPN004925
Page :1 /1
Form No.: DPN001040_REV4
PRIMARY CONNECTION LOCATIONS
LIEBERT CW
X in. (mm) Y in. (mm) X in. (mm) Y in. (mm)
HV1 6-3/8 (162) 5-3/4 (146) 6 (153)
HV2 3 (76) 2-5/8 (67) 4-1/4 (109)
LV1 21 (532) 6-1/2 (164 6-1/2 (166)
LV2 22-3/8 (567) 5-1/8 (129) 4-1/2 (115)
LV3 18-1/4 (462) 6-1/2 (164) 6-1/2 (166)
LV4 19-5/8 (497) 5-1/8 (129) 4-1/2 (115)
CD Condensate Drain N/A N/A 83 (2108) 3-5/8 (94) 3/4" NPT Female
CP Condensate Pump 20-1/8 (512) 27-7/8 (708) N/A N/A 1/2" O.D. Cu
S Supply Pipe Connection 9 (229)
R Return Pipe Connection 15 (381)
Connection Size/Opening
2-1/2"
N/A N/A
1-1/2"
30 (762) 4-1/8" O.D. Cu
20-3/4 (527)
POINT Description
Electrical Conn. (High Volt)
6-1/4 (160)
22-3/4 (578)
Electrical Conn. (Low Volt)
Notes:
1. Drawing not to scale. All dimensions from right corner on service side and have a tolerance of ± 1/2" (13mm).
2. Field pitch Condensate Drain line a minimum of 1/8" (3.2mm) per 12" (305mm). Install an external 5-1/2" (140mm) trap in the drain line (if desired).
The factory unit does not contain a trap. Select appropriate drain system materials. The drain must comply with all local codes.
3. Piping connection can be made at the top or bottom of the unit.
X
Y
O
O
X
Y
2
Data Hall Side
CW305, 375, 415 GALLERY W/ HORIZONTAL DISCHARGE
FRONT LEFT FACING ELECTRICAL/PIPING COMPARTMENT
Top View
Bottom View
1
1
HV1
HV2
LV1
LV3
LV2
LV4
CP
HV1
HV2
LV1
LV3
LV2
LV4
RS
CD
Gallery Side
R