2.2.2. Heat pump installation.
The frame must be fixed by bolts (M10) to concrete foundation or brackets. The
concrete foundation must be solid; the bracket must be strong enough and anti-rust
treated;
The heat pump needs a water pump (Supplied by the user). The recommended pump
specification-flux: refer to Technical Parameter, Max. lift ≥10m
When the heat pump is running, there will be condensation water discharged from the
bottom, please pay attention to it. Please insert the drainage tube(accessory) into the
hole and clip it well, then connect a pipe to drain off the condensation water.
2.2.3. Wiring & protecting devices and cable specification
Connect to appropriate power supply, the voltage should comply with the rated voltage
of the products.
Well earth the heat pump.
Wiring must be connected by a professional technician according to the circuit
diagram.
Set breaker or fuse according to the local code (leakage operating current ≤ 30mA).
The layout of power cable and signal cable should be orderly and not affecting each
other.
A
B
C
D
E
F
G
H
VESIN10
315
590
312
340
961
280
74
658
VESIN13
315
590
312
340
961
340
74
658
VESIN17
395
590
392
420
961
390
74
658
VESIN28
395
720
391
420
1092
620
74
958
VESIN36T
505
790
496
530
1161
650
74
958
Name
BE
Size(mm)
Model

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VESUVIO VESIN10 and is the answer not in the manual?

VESUVIO VESIN10 Specifications

General IconGeneral
BrandVESUVIO
ModelVESIN10
CategoryHeat Pump
LanguageEnglish

Related product manuals