EasyManua.ls Logo

VEVOR BATHROOM MASTER - Installation Requirements; Installation Location and Configuration Rules

VEVOR BATHROOM MASTER
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 8 -
15. Duct work should be installed in a straight line with minimal bends
16. Duct work size must be the same size as the discharge and should not
be reduced. Reducing the duct size may increase fan noise.
17. Prior to servicing or cleaning this unit, shut off power supply at the
panel and lock to prevent the power from being turned on. If the panel
cannot be locked, clearly mark the panel with a warning tag to prevent
the power from being turned on
18. Use this unit in the manner intended by the manufacturer. If you have
any questions, please call customer service.
Installation Requirements

Related product manuals