6) Tower installation fixed,when install tower,please ensure that the tower
is perpendicular to the horizontal plane,deviation should be 0.5 degrees or
less;
7) Charge controller installation:
charge controller connected to the battery first,the battery connection
terminal “+”“-” connect to the charge controller “+” “-”o n the right.
8) Connect the wire line. The output of the wind turbine is three-phase
AC, and the three terminals of the three lead wires are connected to the
controller without distinguishing between the positive and negative
terminals (show.Note:the controller is connected to the battery before
connecting the wind turbine).
Although your wind turbine has been designed to run for long periods
without requiring any maintenance,reliability and performance will be
enhanced if you periodically inspect your system.
After blades for chips or nicks.Replace blades if damaged. Do not
operate the turbine with chipped or unbalanced blades. This can cause
severe wear, damage, and possible failure.Do not install individual