vi
Installation Checklist
After the cabinet has been installed, leveled and cleaned as described, refer to the following
checklist prior to start-up.
Check for proper electrical hook-up.
Check exposed refrigeration line connections for leaks. Make sure refrigeration lines are
not dented, kinked or rubbing.
Check condenser fan for freedom to rotate without striking any stationary members.
Check that cabinet is level.
Product Load
After the refrigerator or freezer has been started and reaches the proper storage temperatures,
food may be loaded. For optimum energy efficiency, we recommend allowing a 1-1/2” clearance
between the interior cabinet wall and product load.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Victory FS-2D-S7 and is the answer not in the manual?

Victory FS-2D-S7 Specifications

General IconGeneral
BrandVictory
ModelFS-2D-S7
CategoryRefrigerator
LanguageEnglish

Related product manuals