Service
6
Service
Inspection and (if necessary) cleaning of tank must take place within 2 years of
initial start-up and as required thereafter.
We also recommend annual inspection of
the magnesium anode. The inspection
takes place with an anode testing
device, measuring the protective current
(see following page) and does therefore
not require shut-down of the heating
system.
1. Shut down heating system
Ensure main power supply to
equipment, the heating system, and all
external controls has been deactivated.
Take precautions in all instances to
avoid accidental activation.
2. Check all connections
1. Check boiler heating water side and
domestic water side adaptors for
leaks. Tighten if necessary.
2. Check sensor well for leaks. Tighten
if necessary.
3. Ensure proper operation of all safety devices
Verify proper operation of temperature
and pressure relief valve (T&P valve).
5167 515 - 01
IMPORTANT