Initial Start-up
5
Initial Start-up
For initial start-up of the tank
see Operating Instructions and
User’s Information Manual
of tank.
See Installation Instruction
Supplement supplied with tank.
1. Fill tank with domestic drinking
water.
2. Check heating side and domestic
water side adaptors for leaks. Tighten
if necessary.
3. Check sensor well for leaks. Tighten
if necessary.
4. Verify proper operation of
temperature and pressure relief valve
(T&P valve).
Use hemp and pipe sealant on all
threaded steel nipples on tank.
See Installation Instruction
Supplement for fittings
supplied with tank.
5167 515 - 01
Tightening the inspection and
clean-out opening is not necessary.
CAUTION
IMPORTANT