5
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Checking the high limit safety cut-out setting............. 7
•
2. Filling the heating system with water and venting the
system............................................................................. 7
•
3. Filling siphon with water................................................ 7
• • •
4. Starting the heating system........................................... 7
•
5. Checking the gas type.................................................... 9
•
6. Conversion to natural gas LL........................................ 9
• • •
7. Checking the static and the supply pressure.............. 12
• • •
8. Checking the CO
2
content.............................................
14
• • •
9. Checking the CO content
• • •
10. Checking the flue gas temperature
• •
11. Checking the ionisation current.................................... 19
• •
12. Shutting down the system............................................. 20
• •
13. Opening the boiler door................................................. 20
• •
14. Separating the neutralising system (if installed) from
the boiler and connecting the drain hose.................... 20
• •
15. Cleaning the combustion chamber and heating
surfaces........................................................................... 20
• •
16. Checking gaskets and thermal insulation
components.................................................................... 21
• •
17. Checking all heating water connections and the
sensor well for leaks...................................................... 22
• •
18. Cleaning and reconnecting the condensate drain
system............................................................................. 22
• •
19. Checking the condensate drain and the neutralising
system (if installed)........................................................ 23
• •
20. Checking the burner gauze assembly.......................... 24
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance