for use by heating contractor
Please file in Service Binder
5683 706 - 01 01/2014
Installation Instructions
Vitodens 200-W, Series B2HA
Models 80, 100
Wall-mounted, gas-fired condensing boiler
For operation with natural gas and liquid propane gas
Heating input: 104 to 352 MBH
30 to 103 kW
VITODENS
r
200-W
Read and save these instructions
for future reference.
Product may not be exactly as shown
IMPORTANT
H

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Viessmann Vitodens 200-W B2HA 80 and is the answer not in the manual?

Viessmann Vitodens 200-W B2HA 80 Specifications

General IconGeneral
ModelVitodens 200-W B2HA 80
CategoryBoiler
Fuel TypeNatural Gas or Propane
Heat Exchanger MaterialStainless Steel
Water Connection Size1 inch
Gas Connection Size3/4 inch
Connection for Heating Flow/Return1 inch
Electrical Connection120 V, 60 Hz
TypeWall-mounted
Output80, 000 BTU/hr
ControlVitotronic 200
Vent Size2"
EfficiencyUp to 98% AFUE

Summary

Safety, Installation and Warranty Requirements

Licensed professional heating contractor

Installation must be done by a licensed professional.

Carbon monoxide

Warns about CO risks from improper venting.

Fresh air

Highlights need for adequate ventilation for safe operation.

Equipment venting

Stresses importance of proper venting for safety.

General Information

Important Regulatory and Installation Requirements

Details codes, user training, start-up, and service procedures.

Mechanical Room

Specifies requirements for the boiler installation location.

Set-up

Minimum Clearances

Specifies required clearances around the boiler.

Boiler Connections

Wall Mounting

Instructions for fitting and installing the wall mounting bracket.

Wall Mounting (continued)

Steps for mounting the boiler onto the bracket and leveling.

Frame Mounting

Instructions for installing the boiler on a stand.

Models B2HA 45, 60 Frame Mounting

Steps for mounting the boiler onto a frame.

Safety Connections and Pressure Testing

Installing safety devices like pressure relief valves.

Safety Connections and Pressure Testing (continued)

Low water cut-off and performing pressure tests.

Waterside Flow

Details on flow rates and pressure drop for different configurations.

Boiler in Heating/Cooling

Instructions for using the boiler in a heating/cooling system.

Boiler with Low Water Cut-off

Details on installing a low water cut-off device.

Venting Connection

Notes on venting system installation and potential material effects.

Control Connections

Electrical Connections

Power supply for accessories and routing cables.