NOTE: THE CCS UNIT HAS BEEN PRESSURE TESTED BEFORE SHIPMENT FOR QUALITY ASSURANCE. DO
NOT FILL TANK WITH WATER IN PREPARATION FOR HYDROTESTING WATER SUPPLY OR SPRINKLER SYSTEM
PIPING. DO NOT PRESSURIZE TANK. ISOLATION VALVE NO.’s 1 AND 2 MUST REMAIN CLOSED DURING PIPING
HYDROTEST.
WARNING
DO NOT WELD ON VESSEL
THIS VESSEL CONTAINS A RUBBER DIAPHRAGM WHICH WILL BE DAMAGED BY WELDING
TEMPERATURES.
IMPROPER FILLING OF THIS VESSEL WILL DESTROY THE RUBBER
DIAPHRAGM IT CONTAINS
CAREFULLY READ AND FOLLOW THE FILLING INSTRUCTIONS
FURNISHED BY THE “CCS SYSTEM” MANUFACTURER TO AVOID
DAMAGE
THE VIKING CORPORATION
HASTINGS MI 49058
8