EasyManuals Logo

VOKERA Linea Installation & Servicing Instructions

VOKERA Linea
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
Supplied By www.heating spares.co Tel. 0161 620 6677
8
Linea
Pipe work from the meter to the appliance must
be of adequate size. Pipes of a smaller size than
the appliance gas inlet connection must not be
used. The installation must be tested for sound-
ness in accordance with I.S. 813.
If the gas supply serves more than one appli-
ance, it must be ensured that an adequate sup-
ply is maintained to each appliance when they
are in use at the same time.
3A.4 FLUE SYSTEM
The terminal should be located where the dis-
persal of combustion products is not impeded and
with due regard for the damage and discolora-
tion that may occur to building products located
nearby. The terminal must not be located in a
place where it is likely to cause a nuisance (see
I.S. 813).
In cold and/or humid weather, water vapour may
condense on leaving the terminal; the effect of
such pluming must be considered.
If installed less than 2m above a pavement or
platform to which people have access (including
balconies or flat roofs) the terminal must be pro-
tected by a guard of durable material. The guard
must be fitted centrally over the terminal. Refer
to I.S. 813, when the terminal is 0.5 metres (or
less) below plastic guttering or 1 metre (or less)
below painted eaves.
3A.5 AIR SUPPLY
The following notes are intended for general guid-
ance only.
This appliance is a room-sealed, fan-flued boiler,
consequently it does not require a permanent air
vent for combustion air supply.
When installed in a cupboard or compartment,
ventilation for cooling purposes is also not re-
quired.
3A.6 WATER CIRCULATION
Specific recommendations are given in I.S. 813.
The following notes are for general guidance only.
3A.6.1 PIPEWORK
It is recommended that copper tubing be used in
conjunction with soldered capillary joints.
Where possible pipes should have a gradient to
ensure air is carried naturally to air release points
and that water flows naturally to drain cocks.
Except where providing useful heat, pipes should
be insulated to avoid heat loss and in particular
to avoid the possibility of freezing. Particular at-
tention should be paid to pipes passing through
ventilated areas such as under floors, loft space,
and void areas.
3A.6.2 AUTOMATIC BY-PASS
The appliance has a built-in automatic by-pass,
consequently there is no requirement for an ex-
ternal by-pass, however the design of the sys-
tem should be such that it prevents boiler ‘cy-
cling’.
3A.6.3 DRAIN COCKS
These must be located in accessible positions to
facilitate draining of the appliance and all water
pipes connected to the appliance.
3A.6.4 AIR RELEASE POINTS
These must be positioned at the highest points in
the system where air is likely to be trapped. They
should be used to expel trapped air and allow
complete filling of the system.
3A.6.5 EXPANSION VESSEL
The appliance has an integral expansion vessel
to accommodate the increased volume of water
when the system is heated. It can accept up to 8
litres (726/730) or 10 litres (735) of expansion
from within the system, generally this is sufficient,
however if the system has an unusually high water
content, it may be necessary to provide additional
expansion capacity (see 6.19).
3A.6.6 FILLING POINT
A method for initial filling of the system and re-
placing water lost during servicing etc. has been
provided. You should ensure this method of fill-
ing complies with the local water authority regu-
lations.
3A.6.7 LOW PRESSURE SEALED SYSTEM
An alternative method of filling the system would
be from an independent make-up vessel or tank
mounted in a position at least 1 metre above the
highest point in the system and at least 5 metres
above the boiler (see fig. 5).
The cold feed from the make-up vessel or tank
must be fitted with an approved non-return valve
and stopcock for isolation purposes. The feed
pipe should be connected to the return pipe as
close to the boiler as possible.
3A.6.8 FREQUENT FILLING
Frequent filling or venting of the system may be
indicative of a leak. Care should be taken during
the installation of the appliance to ensure all as-
pects of the system are capable of withstanding
pressures up to at least 3 bar.
3A.7 ELECTRICAL SUPPLY
The appliance is supplied for operation on 230V
@ 50Hz electrical supply; it must be protected
with a 3-amp fuse. The method of connection to
the mains electricity supply must allow for com-
plete isolation from the supply. The preferred
method is by using a double-pole switch with a
contact separation of at least 3mm. The switch
must only supply the appliance and its corre-
sponding controls, i.e. time clock, room thermo-
stat, etc.
3A.8 SHOWERS
If the appliance is intended for use with a shower,
the shower must be thermostatically controlled
and be suitable for use with a combination boiler.

Table of Contents

Other manuals for VOKERA Linea

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VOKERA Linea and is the answer not in the manual?

VOKERA Linea Specifications

General IconGeneral
TypeCombi Boiler
MountingWall-mounted
Fuel TypeNatural Gas
IgnitionElectronic
Weight31 kg
Water Pressure0.8 - 3.0 bar

Related product manuals