EasyManua.ls Logo

Volvo D12D - Page 19

Volvo D12D
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
camshaft. Tighten the attaching bolts, see:
214 Rocker arm shaft, tightening torques
24. Wipe clean the cylinder head by the IEGR-valve. Check for any impurities or dirt in the cylinder head's oil channel.
25. Install the IEGR control valve with new O-rings.
26. Install the stud bolt in front of the IEGR-valve.
27. Install the electrical connections for the unit injectors and the control valve.
28. Adjust the valves and the unit injectors, see .
214 Valves, adjusting
29. Install the valve cover. Tighten the bolts according to tightening diagram. Tightening torque, see
200 Engine, tightening torques
30. Install the fuel lines' connections on the cylinder head.
31. Bleed the fuel system, see
233 Fuel system, bleeding

Related product manuals