EasyManuals Logo

VTech Toot-Toot Drivers Construction Site User Manual

VTech Toot-Toot Drivers Construction Site
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
12
ASSEMBLY INSTRUCTIONS
1. Assemble and attach the 3-loop spiral track components following
the steps as below:
A: Insert one Spiral Support into the Spiral Track Base, attach
the other Spiral Support. Make sure you hear a clicking sound to
confirm they are firmly connected. Tighten it with two screws to
secure.
B: Insert Track A into the Spiral Support, attach Track B to Track
A, attach Track C to Track B. Attach the Sign into the Tower
Top, insert the SmartPoint™ launcher to Track A. Insert the
Guideboard Shaft to Track B first, then attach the Guideboard
into the Guideboard Shaft.
With the VTech
®
Toot-Toot Drivers
®
Construction Site, safety
comes first. To ensure your child’s safety, adult assembly is required.

Other manuals for VTech Toot-Toot Drivers Construction Site

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VTech Toot-Toot Drivers Construction Site and is the answer not in the manual?

VTech Toot-Toot Drivers Construction Site Specifications

General IconGeneral
BrandVTech
ModelToot-Toot Drivers Construction Site
CategoryToy
LanguageEnglish

Related product manuals