EasyManua.ls Logo

Wacker Neuson DW100

Wacker Neuson DW100
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA D18 us* 1.1 * D18i400.fm 4-39
Putting into operation 4
6. Open the engine cover.
7. Connect the battery jumper cables in the following order: C-D-E-F.
8. Wait five minutes for the empty battery to be charged a little.
WARNING
Injury hazard due to open base cover!
Can cause serious injury and death.
Ensure a secure footing when you get on the machine with the base
cover open.
9. Start the engine of machine X.
10.Disconnect the battery jumper cables in the following order: F-E-D-C.
11.Install the base cover again and secure it with the screws.
12.Fit rubber mat A.
Fig. 98 (symbolic representation)
Starting
battery
F
C
D
E

Table of Contents

Related product manuals