5-44 BA EZ17 en* 1.1 * ez17b510.fm
5 Operation
1. Move the attachment inward completely and position it
at 5–10 cm (2–4 in) above the ground.
2. Unlock switch D and press it to position 1.
The quickhitch is enabled and the buzzer sounds.
3. Press and hold the foot-operated touch button E and at the same time
pull back the J dozer blade lever.
The quickhitch opens.
Check pin F must be fully extended.
4. Retract the bucket cylinder.
The attachment is lowered to the ground.
Fig. 145
D
1
E
J
Fig. 146
Fig. 147
F
Fig. 148