BA EZ17 en* 1.1 * ez17b510.fm 5-49
Operation 5
Proceed as follows after a damage:
1. Stop the machine immediately.
2. Stop the engine.
3. Move the control lever or stabilizer blade lever to neutral.
4. Perform emergency lowering if possible – see chapter “5.12
Emergency lowering” on page 5-62.
5. Raise the control lever base.
6. Remove the starting key and lock the cabin.
7. Secure the machine and the attachment.
8. Contact a Wacker Neuson service center and have the malfunction
rectified.
Use a suitable container to collect fluids and lubricants as they flow out
and dispose of them in an environmentally friendly manner.