EasyManua.ls Logo

Wacker Neuson E13-01 - Page 173

Wacker Neuson E13-01
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA EZ17 en* 1.1 * ez17w700.fm 7-7
Maintenance 7
Preparing lubrication
1. Stop the machine on firm, level, and horizontal ground.
2. Position the boom straight ahead at the center of the machine.
3. Lower the boom and the stabilizer legs to the ground.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
7. Remove the starting key and carry it with you.
8. Safely store all loose objects.
9. Close the windows and doors.
10.Close and lock all covers.
11.Attach a warning label to the control elements (for example “Machine
being serviced, do not start”).
Wait at least 10 minutes after stopping the engine.
Information
Keep all lubrication points clean and remove any escaping grease.
Fig. 190

Table of Contents

Related product manuals