EasyManuals Logo

Wacker Neuson E16-02 User Manual

Wacker Neuson E16-02
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #105 background imageLoading...
Page #105 background image
BA E16 en* 1.0 * E16_10_400.fm 4-41
Putting into operation 4
Warm-up phase of vehicle
After the engine has started, allow it to warm up at slightly increased idling
speed until it reaches its operating temperature of about 80 °C (176 °F)
(coolant).
However, do not let the machine warm up at standstill.
During the warm-up phase, check for unusual noise, exhaust color, leaks,
malfunctions or damage.
In case of malfunctions, damage, or leaks:
Secure the vehicle, park it and find out the cause for the damage and
have it repaired.
Information
Fold up the control lever base after shutting off G the engine.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E16-02 and is the answer not in the manual?

Wacker Neuson E16-02 Specifications

General IconGeneral
BrandWacker Neuson
ModelE16-02
CategoryExcavators
LanguageEnglish

Related product manuals