EasyManua.ls Logo

Wacker Neuson E16-02 - Page 110

Wacker Neuson E16-02
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-46 BA E16 en* 1.0 * E16_10_400.fm
4 Putting into operation
Battery master switch
NOTICE
Possible damage to the electronics due to improper actuation of the
battery master switch.
► Do not operate the battery master switch with a running engine.
► Operate the battery master switch no sooner than two minutes after
shutting down the engine.
Actuate the battery isolator switch:
• If the vehicle is parked for longer periods of time (e.g. over the
weekend).
• If the vehicle is to be protected against unintentional taking into
service.
• If required by national and regional provisions.
The battery master switch is located on the left in the engine
compartment.
Fig. 121
1
2
Power supply Key position
Connection 1
Interrupt 2 (Remove key)

Table of Contents