4-46 BA E16 en* 1.0 * E16_10_400.fm
4 Putting into operation
Battery master switch
NOTICE
Possible damage to the electronics due to improper actuation of the
battery master switch.
Do not operate the battery master switch with a running engine.
Operate the battery master switch no sooner than two minutes after
shutting down the engine.
Actuate the battery isolator switch:
If the vehicle is parked for longer periods of time (e.g. over the
weekend).
If the vehicle is to be protected against unintentional taking into
service.
If required by national and regional provisions.
The battery master switch is located on the left in the engine
compartment.
Fig. 121
1
2
Power supply Key position
Connection 1
Interrupt 2 (Remove key)