EasyManua.ls Logo

Wacker Neuson E16-02

Wacker Neuson E16-02
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-52 BA E16 en* 1.0 * E16_10_510.fm
5 Operation
AUX V (option)
The change-over takes place on the left and right of the stick.
Stopping grab operation:
1. Move both levers D on the ball-type cock to position B.
Notch C indicates the flow direction.
Stopping bucket operation:
1. Move both levers D on the ball-type cock to position A.
Fig. 214
Fig. 215
B
D
C
Fig. 216
A
D

Table of Contents

Related product manuals