BA E16 en* 1.0 * E16_10_510.fm 5-73
Operation 5
Raise the upper carriage:
1. Press and hold the switch 1.
2. Press control lever 2 to the right.
The upper carriage lifts.
3. If the required tilt angle is reached, return joystick 2 to the neutral
position and release switch 1.
Lower the upper carriage:
1. Press and hold the switch 1.
2. Press control lever 2 to the left.
The upper carriage lowers.
3. If the required tilt angle is reached, return joystick 2 to the neutral
position and release switch 1.
Shovel bucket operation
NOTICE
The stick can be damaged if it is hit by the bucket base.
Do not tilt out the bucket completely if it is used as a shovel bucket.
Trailer operation
The vehicle is not certified for trailer operation!
Fig. 249 Tilting the upper carriage
1
2
Fig. 250 (symbolic representation)