EasyManuals Logo

Wacker Neuson E16-02 User Manual

Wacker Neuson E16-02
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #203 background imageLoading...
Page #203 background image
BA E16 en* 1.0 * E16_10_700.fm 7-9
Maintenance 7
Preparing lubrication
1. Stop the vehicle on firm, level, and horizontal ground.
2. Position the boom straight ahead at the center of the vehicle.
3. Lower the boom and the stabilizer legs to the ground.
4. Stop the engine.
5. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
6. Raise the control lever base.
7. Remove the starting key and carry it with you.
8. Safely store all loose objects.
9. Close the windows and doors.
10.Close and lock all covers.
11.Attach a warning label to the control elements (for example “Machine
being serviced, do not start).
Wait at least 10 minutes after stopping the engine.
Information
Keep all lubrication points clean and remove any escaping grease.
Fig. 264

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E16-02 and is the answer not in the manual?

Wacker Neuson E16-02 Specifications

General IconGeneral
BrandWacker Neuson
ModelE16-02
CategoryExcavators
LanguageEnglish

Related product manuals