EasyManuals Logo

Wacker Neuson E16-02 User Manual

Wacker Neuson E16-02
302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #205 background imageLoading...
Page #205 background image
BA E16 en* 1.0 * E16_10_700.fm 7-11
Maintenance 7
Position Lubrication point
1
Interval Quantity
1 Boom Daily 2
2
Boom cylinder Daily 2
3
Shovel arm Daily 2
4
Stick cylinder Daily 2
5
Bucket cylinder Daily 2
6
Joint rod Daily 2
7
Easy Lock Daily 2
8
Swiveling console Daily 2
9
Swiveling cylinder 50 o/h 2
10
Teeth of live ring
see chapter “ Teeth of live ring” on page 7-15
50 o/h 1
11
Live ring (ball bearing)
see chapter “ Live ring ball bearing” on page 7-14
50 o/h 1
12
Stabilizer blade Daily 4
13
Swiveling dozer blade Daily 7
1. Lubrication on the pins or directly on the cylinders

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E16-02 and is the answer not in the manual?

Wacker Neuson E16-02 Specifications

General IconGeneral
BrandWacker Neuson
ModelE16-02
CategoryExcavators
LanguageEnglish

Related product manuals