Page | 16
Parallel operation procedure:
Do not attempt to connect running generators in parallel. Damage to the
generators may occur.
1. Turn off both generators and disconnect all the electrical devices from the generators
2. Connect the parallel kit to each generator by inserting a pair of leads plus ground wire from
the parallel box to the parallel receptacles and ground lug on the panel.
3. Start both generators and confirm that both green "RUN" lights are illuminated. The Smart
Throttle system may be used as long as the Smart Throttle setting of both generators is
the same.
4. Plug an electrical appliance into the parallel cable receptacle box and switch on the
appliance.
The electrical appliance load cannot exceed the rated output of
parallel generators or the parallel box circuit breaker(s).
Do not use the receptacles on the control panel of either generator.
Do not disconnect the parallel cables during operation.
Shutting off the generators:
1. Turn off the power of electrical appliance then, pull out the receptacle plug.
2. Turn off the two generators.
3. Disconnect the parallel kits from the generators.
MAINTENANCE
The purpose of the maintenance and adjustment schedule is to keep the generator in optimum
operating condition.
Shut off the engine before performing any maintenance.