EasyManua.ls Logo

WaterFurnace Envision User Manual

WaterFurnace Envision
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IM1007WNA 01/21
Installation Information
Water Piping Connections
Electrical Data
Microprocessor Control
Startup Procedures
Preventive Maintenance
NDW Installation Manual
NDW 8 to 15 Tons Hydronic Heat Pump
Question and Answer IconNeed help?

Do you have a question about the WaterFurnace Envision and is the answer not in the manual?

WaterFurnace Envision Specifications

General IconGeneral
Efficiency (COP)Up to 5.3
Efficiency (EER)Up to 41
RefrigerantR-410A
EfficiencyUp to 41 EER
Heating Capacity2 to 6 tons
Cooling Capacity2 to 6 tons
Warranty10 years parts

Summary

General Installation Information

Safety Considerations

Crucial safety precautions for installing and servicing HVAC equipment.

Field Connected Water Piping

Water Quality Guidelines

Electrical Data

Wiring Schematics

208-230/60/1 Supply Power Wiring

Wiring diagrams for 208-230/60/1 supply power with HydroZone system.

208-230/60/1 Soft Start & HydroLink Wiring

Wiring diagrams for 208-230/60/1 with soft start and HydroLink.

3PH Supply Power Wiring

Wiring diagrams for 3-phase supply power with HydroZone system.

100-180 208-230/60/1 HydroLink Wiring

Wiring diagrams for 100-180 208-230/60/1 with HydroLink system.

100-180 Soft Start HydroLink Wiring

Wiring diagrams for 100-180 208-230/60/1 with soft start and HydroLink.

3PH Supply Power HydroLink Wiring

Wiring diagrams for 3-phase supply power with HydroLink system.

The Aurora Base Control System

Aurora 'Base' Control Features

Overview of features for the Aurora Base Control system.

Aurora 'Advanced' Control Features

Additional features of the Aurora Advanced Control system with AXB.

HydroZone Controller Instructions

Unit Startup

Pre-Startup Verification Checklist

Pre-startup checklist to ensure proper installation and readiness.

Control System Initial Configuration

Essential setup procedures for the Aurora control system.

Operating Parameters

Heating Cycle Analysis

Cooling Cycle Analysis

Startup and Troubleshooting Form

Troubleshooting Common Issues

Preventive Maintenance

Related product manuals