ADDITIONAL INFORMATION
Alternatively if the above soft reboot does not work you can try this.
Recycle PC.
Shut all modules on the UPLC stack.
Login to PC.
Turned power back on to MS (If the system is vented). Or press the EPC reboot switch as described above if system is
under vacuum.
Wait 5 minutes for comms.
Verified comms with Mass Spec by checking Telnet EPC in Microsoft command window.
Enter Masslynx.
Waters - The Science of What's Possible.
https://support.waters.com/KB_Inst/Mass_Spectrometry/WKB7610_No_communications_with_the_XEVO_TQD
Updated: Fri, 17 Sep 2021 00:04:37 GMT
Powered by
2