EasyManua.ls Logo

Westfield MK130 Plus - Operation; Pre-Operational Checklist; Auger Drive & Lockout

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WESTFIELD - GRAIN AUGERS 5. OPERATION
MK 100/130 PLUS X 91’ - 111’ 5.1. PRE-OPERATIONAL CHECKLIST
30260 R0 49
5.Operation
5.1. PRE-OPERATIONAL CHECKLIST
Before operating auger each time, the operator must confirm the following:
All fasteners are secure as per assembly instructions.
Cable clamps are secure.
Lift cable is not frayed or damaged.
Lift cable is properly seated in cable sheaves.
Hydraulic hoses are in good condition.
Hydraulic connections are in place and secure.
PTO driveline is connected and secure.
PTO driveline shield rotates freely.
Clean-out and service doors and access covers are in place and secure
and safety discharge door is closed.
All safety guards are in place and secure.
Tube alignment is reasonably straight.
Intake area and discharge spout are free of obstructions.
Auger wheels are chocked, and if necessary, tractor wheels are chocked
or the parking brake has been engaged.
Proper maintenance has been performed.
Tractor and auger are in line or as close to being in line as possible.
Ensure that the axles are extended during operation (Section 4.2.).
Know how to safely shut down auger in an emergency.
5.2. AUGER DRIVE & LOCKOUT
Note: If shearbolt in the PTO driveline fails, shut down and lock out tractor to replace
bolt.
The MK100 uses a 5/16” x 1" grade 8 bolt through the shank
shear. Part #17126 includes nut.
The MK130 uses a 3/8” x 1” grade 8 bolt through the shank
shear. Part #18454 includes nut.
Warning: Before continuing, please reread the safety information relevant to this section at
the beginning of this manual. Failure to follow the safety instructions can result in serious
injury, death, or property damage.

Related product manuals