info@winchmax.co.uk Tel +44 (0) 1986899264
5. WINCH OPERATION
•
•
anchor point.
•
•
•
•
can result in rope bunching on the drum which could cause damage to the winch.
•
Note
•
•
•
temperature. If the motor becomes too hot to comfortably put your hand on, stop
•
• We recommend the use of a snatch block and double line technique for any loads
•
•
• Do not engage or disengage the clutch while under load or when the motor is running.
•