EasyManua.ls Logo

Wiratech XBF-500 - Setting Time and Current Parameters; Precautions and Maintenance; Operational and Mold Handling Precautions

Default Icon
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
VI. SET THE HEATING CURRENT CONVERSION, DELAYE
TIME,COOLING & HEATING TIME
1.Inspect the size of the mold and the thickness of the blister pieces.
Adjusting the heating current conversion switch from the low position first. To
set the delayed time for 1 second, the heating time for 3 seconds and the
cooling time for 3 seconds (for reference). Starts to debug the operation.
Inspect the effect of packing. Adjust the heating current conversion switch
lower and shorter the heating time. Do it oppositely if contrary.
2.Adjust the heating time and the heating current conversion switch.
They are international. Generally, the smaller the electric and the longer the
heating time, the better the packing quality will be.
VII.PRECAUTIONS AND MAINTENANCE
1. All the adjustable device must be adjusted from low to high slowly when
debug the new mold which will protect the mold from damage.
2. The mold should be placed on the center of working position to guarantee
the air cylinder to press down evenly.
3. In the production process, the mold is pressed many times. So, it is normal
that the teflon adhesive tape on the mold is damaged. It should be replaced
and repaired in time.
4. In the use of mold, the heating current conversion must be adjusted when
the voltage is too high or too low.