EasyManuals Logo

Worcester Greenstar 9i System ErP Installation, Commissioning And Servicing Instructions

Worcester Greenstar 9i System ErP
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
Appliance information
Greenstar i System
ErP
- 6 720 806 945 (2015/07)
7
3 Appliance information
3.1 Appliance
Fig. 1 Standard package
[1] Wall hung gas-fired condensing system appliance for central
heating and domestic hot water.
[2] Wall mounting frame.
[2.1] Condensate pipe routing.
[2.2] CH Flow.
[2.3] Gas.
[2.4] CH Return.
[2.5] Pressure Relief Valve outlet.
[3] Hardware literature pack:
Installation, Commissioning and Servicing Instructions
•User guide
Wall mounting template
Sealing Pack
[4] ErP label.
[5] Facia panel.
[6] Bottom panel.
6720806945-01.1Wo
1
3
5
6
2
2.3
2.1
2.5
2.4
2.2
4
3
3
0
m
m
7
0
0m
m
*
40
0
mm
*
7
1
0
mm to t
o
p of c
a
s
e
fr
o
nt

Table of Contents

Other manuals for Worcester Greenstar 9i System ErP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Worcester Greenstar 9i System ErP and is the answer not in the manual?

Worcester Greenstar 9i System ErP Specifications

General IconGeneral
BrandWorcester
ModelGreenstar 9i System ErP
CategoryBoiler
LanguageEnglish

Related product manuals