EasyManua.ls Logo

Worcester Greenstar Si Compact Series

Worcester Greenstar Si Compact Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
SYSTEM PRESSURE
Greenstar Si Compact– 6 720 807 278 (2013/05)
4SYSTEM PRESSURE
4.1 SEALED HEATING SYSTEMS
This boiler is fitted to a sealed heating system which is pre-pressurised. Your installer will advise you of the minimum and maximum
pressure indicated on the pressure gauge.
Check regularly that the pressure is maintained.
If the pressure gauge reads less than 1 bar then the system requires re-charging.
Contact your installer or maintenance engineer if a permanent significant decrease or increase in pressure is indicated on the
pressure gauge.
The filling method will be one of three types:
Optional “Keyless”integral filling link
Optional “Keyed” integral filling link
An external filling loop, fitted valves and flexible hose.
4.2 LOCATING THE INTEGRAL FILLING LINK
Removing the bottom panel:
1. Pull the catch down.
2. Slide the panel forward and down to remove
Fig. 2 Bottom panel
Fig. 3 Integral filling link location
6720646608-28.1Wo
2.
1.
67206800521-02.2Wo

Related product manuals