EasyManua.ls Logo

Worcester GREENSTAR SYSTEM FILTER - Chemical Dosing; Chemical Dosing Procedure

Worcester GREENSTAR SYSTEM FILTER
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
CHEMICAL DOSING
6 720 803 839 (2012/11)
Fig. 13
7. Using a suitable spanner open the isolation valves (If the
filter is used on a sealed system, recharge the system to
correct working pressure).
Fig. 14
5CHEMICAL DOSING
1. With a standard radiator key, remove the quick dose air vent
[1].
The built-in, one-way valve will prevent water from
escaping.
Fig. 15
Attach the chemical adaptor and feed in the chemical.
2. Wait five seconds before removing the adaptor.
Fig. 16
3. Replace the quick dose air vent [1].
Allow the system to circulate for 30 seconds.
Fig. 17
The quick dose air vent will accept market-
leading chemical adaptors in either liquid or
concentrate form.
6720803839
-13.1Wo
6.
6720803839
-14.1Wo
7.
1.
6720803839
-15.1Wo
1
6720803839
-16.1Wo
2.
3.
6720803839
-17.1Wo
1