1``\YSQdY_^5hQ]`\U
DUSX^Ydb_^D" % GU \T3_^db_\
FUbcY_^F! !Q^TF! !1
$#
'! "$$
$VVLJQ6FKHGXOH
5. Assign Schedule #2 to make the first spot weld:
SCHEDULE=2
VALVE=3 ;The clamp is still on (SV1) add
SV2, and energize the gun valve
(SV1+SV2=3).
SQUEEZE DELAY=0 ;N/A
SQUEEZE=40 ;Give the electrodes time to close
and build pressure, the clamp is
still energized.
UPSLOPE=0 ;N/A
WELD CYC=8 ;Weld time
WELD CUR=65% ;Pass 65% available current
COOL=0 ;N/A
IMPULSES=1 ;N/A
DOWNSLOPE CYC=0 ;N/A
SLOPE END CUR=20 ;N/A
QUENCH CYC=0 ;N/A
TEMPER CYC=0 ;N/A
TEMPER CUR=0 ;N/A
HOLD CYC=10 ;N/A
WELD COMPLETE=0 ;N/A
SUCCESSIVE SCH=3 ;Turn both valves off and wait for
another initiation. On re-initiation,
go to Schedule #3.
CHAIN SCH=0 ;N/A (The sequence jumped to
Schedule #3.)
OFF CYC=0 ;N/A