Washer
69
PARTS REQUIRED:
DOUBLE DOORS
5
Temporary Support
TP
2 x 4 x 96" (5,1 x 10,2 x 243,9 cm)
3" (7,6 cm) Lag Screw
3" (7,6 cm) Wood Screw
3
4
Washer
5/16" (0,8 cm)
1"
(25 mm)
TP
Attach temporary support TP as a ledger board 1" below
top of oor decking using 3" wood screws .
Center doors in door opening .
Pre-drill holes for lag screws using a 1/8" drill bit.
Remove temporary supports and check that doors open properly.
FINISH
You have nished installing your double doors.
Screw hinges into wall supports using 3" lag screws
with washers as shown.
Top View
3" (76 mm)
Wood Screws