Screws
1-1/2"
(3,8 cm)
57
PARTS REQUIRED:
FRONT GABLE OVERHANG
2" (5,1 cm)
3" (7,6 cm)
FINISH
You have installed your front gable overhang trim.
TQA
INSIDE VIEW
Install front left and right overhang assemblies ush to top of roof panel using (5) 2" nish
nails and ush at peak .
1
Working from inside, screw through roof rafter into gable overhang 2 x 4 TQA.
Use (5) 3" screws spaced apart evenly as shown.
Flush
Finish Nails
ULL