EasyManua.ls Logo

Yealink DECT IP Multi-Cell Deployment ToolKit - Adjusting the Stand Height; Setting up the Measuring Base Station; Mounting the Base Station

Yealink DECT IP Multi-Cell Deployment ToolKit
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting up the Measuring Base Station
1. Mount the measuring base station on the stand
Adjusting the Stand Height
Position the thread of the base station clip on the stand and screw the base station clip into place.
Fix the base station on the base station clip.
Note: In order to better transmit and receive radio signal, we recommend that you place the base station
vertically with one end of the button facing up. To make the base station more secure, make sure the
front side of the base station faces to the buckle.
Adjust the angle of the base station to an appropriate position.
1
2
3
1
2
3
Note: The stand height can be adjusted from 3.28 feet (1.00 meter) to 9.19 feet (2.80 meters).
2
E
N
G
L
I
S
H

Related product manuals