EasyManua.ls Logo

YouKits TJ2B - Operation and Controls; Top Cover Controls and Connectors

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
is also a good practice to placea piece of tape near the connector.
Cut the leads short if they are too high above the main board back, such as the can
inductor leads, CN4 leads. Stick 3 or 4 pieces of thicker tape on the main board. Place a
piece of thin hard card between the tape and the battery to prevent it from touching the
main board.
Never connect the wrong battery polarity! The pin near the enclouser side wall is "-".
4. Operation
1) Controls and connectors on the top cover