EasyManua.ls Logo

YUHAO 1163 - Step 4: Blades and Light Kit Installation; Step 5: Final Check and Operation

YUHAO 1163
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
.7.
Align the blades with the
mounting holes, and then fix
them with screws.
Installation Instruction
Step 5 (Switch on and ceiling fan works)
ON
Step 4 (Blades and Light kit installation)
Remove the pre-installed screws.
Connect the light kit cable, and then lock
the light kit.
Visit www.pmwfan.com
for further assistance.

Related product manuals