EasyManua.ls Logo

Zephyr Typhoon AK2136 - Installation Steps and Electrical Connection

Zephyr Typhoon AK2136
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
8
1. Align folded edge to cabinet base and
wall corner
2. Mark 2 hanging bolt drill locations (A) on
cabinet (see template on page 7).
4. Remove template and drill location (A)
with 1/4” or 3/8” drill bit.
5. Install EZ anchors to (B) as marked.
(see next diagram for EZ anchor
installation).
3. Mark 2 bracket drill locations (for
anchors) (B) on wall.

Related product manuals