Fixed Hoist Test Facility Operation and Maintenance Manual ZOM-12000-7 rev 0
Page 14 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
Controls Frame
3 Phase input power receptacle
Load Cell Readout and 28
VDC power Box
o Mount the controls frame and the 3 phase input power receptacle as shown.
o Mount the Load Cell Readout and 28 VDC power supply box as shown.
o Open up the summing box and attach the load cells and the summing box
output to the load meter readout as per ZGS-12216-2.