EasyManua.ls Logo

Zodiac CADET SOLID 285 - Inflation; Inflate Main Buoyancy Tube; Inflate Keel (Cadet Solid)

Zodiac CADET SOLID 285
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
/ 10
E
N
G
L
I
S
H
7
INFLATION
Activate all valves into inflation position.
Fit the hose to the foot-pump.
To inflate your boat properly, the bottom side of
the foot-pump must rest on a flat ground.
Pump evenly to inflate rapidly.
CAUTION
DO NOT USE A COMPRESSOR OR A BOTTLE OF COMPRESSED AIR
You can use the electrical air pump ACCESS (ask your Dealer).
TO INFLATE THE MAIN BUOYANCY TUBE
Insert the pump hose end piece
Inflate (pressure = 240 mb, refer to PRESSURE section) making sure that each compartment is
equal. When correctly inflated, the internal bulkheads (a) are not visible.
NEVER COMPLETELY
INFLATE A
COMPARTMENT TO FULL
PRESSURE IF OTHER
COMPARTMENTS ARE
TOTALLY DEFLATED
a
100 %
0 % 0 %
1
50 %
50 %
50 %
2
100 %
100 %
100 %
CADET SOLID : INFLATE THE KEEL
Once the floor in assembled, start inflation of the keel (pressure = 240 mb).
Inflation is over: fit the valve caps tight (clockwise).
NOTICE :
A slight air-leak before screwing the valve caps is normal.
ONLY THE VALVE CAPS CAN ENSURE FINAL AIR TIGHTNESS.

Related product manuals